IS 2720: The Complete Guide to India's Soil Testing Code

IS 2720 is the Bureau of Indian Standards series that sets out how soil is tested in India. Every soil report for a building, road or embankment should cite it, part by part. When a report quotes the wrong part, or no part at all, the consultant or highway authority can reject it, and the samples must be taken again. This guide explains how the code is organised, which parts matter most and how to check a report against it.
Key takeaways
- IS 2720, titled Methods of Test for Soils, is a series of separate standards published by BIS.
- Each part covers one test, so a report must cite the exact part and year, such as Part 16:1987 for laboratory CBR.
- Many parts date from the 1970s to the 1990s, yet they remain the published editions.
- Light compaction (Part 7) and heavy compaction (Part 8) give different results, so your specification decides which one applies.
- An accredited lab can issue accredited results only for the parts listed in its scope.
What is IS 2720?
IS 2720 is India’s national code of test methods for soils. For each laboratory and field test, it fixes the apparatus, sample size, procedure and calculation. As a result, two labs testing the same soil should report comparable numbers.
The Bureau of Indian Standards maintains the series, and BIS lists every current part on its published-standards page for soil mechanics. In practice, engineers use the results to classify soil under IS 1498, design foundations and check road layers.
How is the IS 2720 code organised?
The code is organised by test, not by project type. For example, Part 2 covers water content, while Part 16 covers laboratory CBR.
The current BIS list shows 41 published entries, with Part 3 and Part 39 each split into two sections. Broadly, the parts fall into four groups:
- Index properties: water content (Part 2), specific gravity (Part 3), grain size (Part 4), and liquid and plastic limits (Part 5).
- Compaction and density: light and heavy compaction (Parts 7 and 8), plus field density by sand replacement (Part 28) and core cutter (Part 29).
- Strength and settlement: unconfined compression (Part 10), triaxial (Parts 11 and 12), direct shear (Part 13), consolidation (Part 15) and CBR (Parts 16 and 31).
- Chemical and swelling: organic matter (Part 22), pH (Part 26), soluble sulphates (Part 27) and free swell index (Part 40).
Which parts matter most on a construction site?
Most projects need fewer than ten parts of the code. The table lists the parts that appear most often in soil reports for buildings and roads.
Part | Edition | Test | What it tells you |
2 | 1973 | Water content | Natural moisture in the sample |
4 | 1985 | Grain size analysis | Gravel, sand, silt and clay fractions |
5 | 1985 | Liquid and plastic limits | Plasticity and soil classification |
7 | 1980 | Light compaction | MDD and OMC at low compaction energy |
8 | 1983 | Heavy compaction | MDD and OMC for roads and embankments |
13 | 1986 | Direct shear | Cohesion and angle of internal friction |
16 | 1987 | Laboratory CBR | Subgrade strength for pavement design |
28 / 29 | 1974 / 1975 | Sand replacement / core cutter | Field dry density for compaction control |
40 | 1977 | Free swell index | Early warning of expansive soil |
The numbers behind compaction and CBR tests
Light and heavy compaction differ in rammer mass, drop height and layer count.
Setting | Light (Part 7) | Heavy (Part 8) |
Rammer mass | 2.6 kg | 4.9 kg |
Drop height | 310 mm | 450 mm |
Layers | 3 | 5 |
Blows per layer (1,000 ml mould) | 25 | 25 |
Heavy compaction delivers more energy, so it gives a higher maximum dry density and a lower optimum moisture content for the same soil. Consequently, comparing field density against the wrong test can pass or fail a layer unfairly.
Highway works under the MoRTH specifications generally measure field compaction against heavy compaction.
For laboratory CBR, the lab reads the plunger load at 2.5 mm and 5 mm penetration and compares it with standard loads of 1,370 kg and 2,055 kg. Labs usually soak pavement design specimens for four days first.
How to check a soil test report against IS 2720
A sound soil report names the part and edition for every result. Check these five points before you accept one:
- Part and year cited. Every result names its part, such as Part 5:1985, not just “as per IS code”.
- Correct compaction test. Light (Part 7) or heavy (Part 8), as your specification states.
- CBR condition stated. Soaked or unsoaked, with the surcharge used.
- Sample preparation. The lab prepared samples as Part 1 requires.
- Accreditation scope. The test sits within the lab’s scope, which you can verify through NABL.
For example, the Jancy Labs NABL accreditation scope covers Parts 2, 3 (Section 1), 4, 5, 7, 8, 13, 16 and 40. However, consolidation (Part 15) and permeability (Part 17) fall outside that scope. Our soil testing lab page lists every test.
Granular sub-base and wet mix macadam use the same CBR and compaction parts; see our aggregate testing lab for related tests.
Get Your Soil Tested at Jancy Labs
Jancy Labs Private Limited is an accredited civil material testing laboratory (ISO/IEC 17025:2017, Certificate No. TC-12176) in Madurai, Tamil Nadu. We collect samples across Tamil Nadu and accept courier samples from anywhere in India.
Or call +91 86800 49004 · jancylabsmdu@gmail.com · Request a quote
4.8★ · 100+ Google reviews · Mon–Sat, 10:00–18:00
Frequently Asked Questions
Is IS 2720 still the current soil testing code?
Yes. IS 2720 remains the Indian standard series for soil testing, and BIS still lists its parts as published standards, even those dated from the 1970s. A report should cite both the part number and the year.
What is the difference between IS 2720 Part 7 and Part 8?
Part 7 is light compaction, using a 2.6 kg rammer dropped 310 mm onto three layers. Part 8 is heavy compaction, using a 4.9 kg rammer dropped 450 mm onto five layers.
Which soil tests does a building foundation usually need?
A typical foundation report uses water content (Part 2), specific gravity (Part 3), grain size (Part 4), liquid and plastic limits (Part 5) and direct shear (Part 13). Field tests such as the standard penetration test follow a separate code, IS 2131.