Quality check and assurance for building products!

Completed Projects

D

Upgrading Melur – Thirupathur road (SH191) from km 0/000 to 19/500 and km 3/200 to km 27/820 into two lane with paved shoulder and Construction of a bypass from km 27/820 to 30/485 for a length of 2.665k into two lane with paved shoulder and maintenance of entire project stretch design length of 26.785k for 7 years (in the state of Tamil Nadu on Engineering, Procurement and Construction(EPC) mode.

1
E

Balance work for Two lanning with paved shoulder of Dindigul – Theni section of Km 2.750 to Km 273.600 of NH-220 in the state of Tamilnadu under ite rate contract.

2
D
Construction of4 lane Elevated Corridor and Ground level improvements from Pandiyan Hotel Junction (Km 0+000) to (7+300) of Madurai NAtha Section (Package 1) of NH-785 on EPC ode under Bharatala Pariyojana Phase 1 in the state of Tamilnadu.
3
E
Special repairs to approach roads at CGR Tuticorin provision of road furniture and replacement of external signboards at existing OTM, New OTM and CGRA Tuticorin at age (B/R) Turicorin under GE (I) (CG) Chennai M/S Kumaran.
4
D
Madurai – Kanyakumari stretch from Km 116+500 to 180+000 of NH 7 in the state of Tamilnadu.
5
E

Buildings – Construction of a Tower block and additional faculties including furniture and furnishing excluding Medical equipments at Govt. Rajaji Hospital(GRH), Madurai.

6
D
Laying of Cross country R-LNG pipeline from IP-101 to pondichery branchline and associated sectionalising (SV) Stations, receiving terinals (RT) and station works under ETBPNMTPL project.
7
E

CMS Agro foods, Puliyoor- 630611, Madurai.

8
D
Construction line linking work (P way) for railway siding job for our new tank Wagon decanting project site at HPCL-Kappalur, Madurai.
9
E

Design , Construction, Development, Finance, operation and maintenance of Km 368.147 (Start of proposed flyover at Dindigul bypass) to Km 421.196 (Samayanallur) on NH7 in the state of Tamilnadu on Build Operate and Transfer (BOT) basis.

10
D
Four laning of Natham to Thuvarankuruchi section of NH- 785E fro Design Ch : 36+690 to 61+115(Design length 24.425Km) under Bharatmala pariyojana Phase –I (Feer Route Category) on EPC mode in the state of Tamilnadu.
11
E

Dedicated water supply scheme from Madurai city Municipal Corporation from Mullai periyar River at Lower Camp – Package 3

12
D
Execution of Rehabilitation and overlay of Kanyakuari to Etturvattum section on NH-44 (Old NH-7) between Km 52+300 to Km 116+500 in the state of Tamilnadu.
13
E

Execution of Rehabilitation and overlay of Salaipudur to Madurai section on NH-44 (Old NH-7) between Km116+500 to Km 180+000 in the state of Tamilnadu.

14
D
Construction of Compoundwall (West side) and Rising height of Existing Compound wall at DPE, Tuticorin (TN).
15
E

Construction of Four lane divided Highway from Melur(Design Km 0.000/Existing Km 99.920 of NH-38) to Karaikudi (Design Km 45.855/ Existing Km 12.900 of NH 383 ext) (Design Length – 45.855Km) in the state of Tamilnadu under Bharatala Pariyojana on EPC mode.

16
D
Construction of 400Kv D/C Ottapidaram TL.
17
E

Four laning of mukkola Junction to Kerala/Tamilnadu Border Km26+500 to Km 43 +000 of NH 47 (New NH56) under NHDP Phase-3 in the state of Kerala on EPC mode.

18
D
Balance work for two laning of Trichy to Karaikudi section of NH210 (from Km 10.000 to Km 94.000) on Trichy Bypass of NH 67(From Km 110.016 to Km 136.225) in the state of Tamilnadu.
19
E

Four laning of madathukulam to Pollachi section of NH-209 (New NH-83) from design Km 74.380 to Km 116.950 (Total length-50.078 Km)under Bharayala Pariyojana Phase I under the category of Residual works of NHDP on HAM in the state of Tamilnadu.

20
D
Elimination of blackspots TN-02(44) through construction of four lane VUP with Two lane service road on both sides and junction improvement at Km 84+650 by providing permanent Mitigation measures on NH-38 (Old NH-45B) in the state of Tamilnadu of EPC mode.
21
E

Strengthening and Widening (Four Lane) of Tirunelveli – Sengottai – Kollamroad (SH-39) Km 5+000 to Km 27+700 (Package I).

22
D
Madurai NH circle – Dindigul(NH) Division : “Widening & Strengthening from (i) Two Lane to Two Lane with paved shoulder from Km 0/500 -1/100, 5/700-21/070, 1/500-34/200 and 34/870-38/000 and (ii)Strengthening of existing four Lane from Km 0/000- 0/550, 1/100-1/780, 2/420-5/700, 21/070-21/500, 34/200-34/870 & Two lane from Km 1/780-2/420 (Diniigul to Natha Section) of NH 383 in the state of Tamilnadu of EPC mode”.
23
E

Gauge conversion between Madurai and Bodinayakanur- Construction of Retaining wall, Protective works at the Major Bridge approaches and at the locations of High bank, Construction of LUS in lieu of LC No.36 and other miscillaneous works between Usilampatti and Bodinayakkanur stations and Construction of Track Machine rest house at Usilampatti and SSE signal office at Madurai.

24
D
Operation and Maintenance for Madurai – Aruppukottai – Thoothukudi Section of NH-45B from Km 138/800 to Km 266/865 in the state of Tamilnadu under NHDP Phase – IIIA.
25
E

Four lane divided highway from Melur (Design km 0.000/existing Km 99.920 of NH-38) to Karaikudi (Design Km 45.855/existing Km 12.900 of NH-383 ext.) (Design Length = 45.855 Km) in the state of Tamilnadu under Bharatmala Pariyojana on EPC Mode.

26
D
Tamilnadu Road Sector Project – II, Kanchipuram Division, Arcot to Villupuram Road (SH-04) Km 29/000 to 110/165 and Km 113/325 to 114/600.
27
E

Tamilnadu Road Sector Project – II, Kanchipuram Division, Kanchipuram – Vandavasi Road (SH-116) Km 14/300 to Km 36/700.

28
D
Tamilnadu Road Sector Project – II, Kanchipuram Division, Sadras – Chengalpattu – Kanchipuram – Arakkonam – Thiruthani Road (SH-58) Km 0/000 to Km 26/811.
29
E

Chennai Kanyakumari Industrial Corridor Project (CKICP) – Kumbakonam(H) Division- Upgradation of Thanjavur – Mannargudi Road(SH-63) from Km 0/000 to Km 15/250 & Km 17/100 – Km 27/585 to Two lane with paved shoulders maintenance of entire project stretch of 25.735Km for a period of 7 years “(in the state of Tamilndau on Engineering, Procurement and Construction(EPC) Mode)”.

30
D
Dedicated water supply scheme for Madurai Corporation from Mullai Periyar River at Lower Camp including Headworks Raw water Pipeline – Package 1.
31
E

Construction, Operation and Maintenance of Madurai – Tuticorin Section from Km 138.800 to Km 266.865 of NH 45B in the state of Tamilnadu under NHDP Phase IIIA on BOT – Package No. NHDP-III/BOT/TN/04.

32

Address Info

No.6, Ganesh Nagar 3rd street, Alagar koil Main road, Behind K.Pudur E1 police station, Madurai -07
+91 86800 49004
jancylabsmdu@gmail.com

Locate Us

Design by Cbra

Copyright 2022 © Jancy Labs Private Limited